
Notice Links:
| Posted | Mon, 2 Mar 2026 21:29 PM UTC
Mon, 2 Mar 2026 16:29 PM EST |
|---|---|
| Last Update | Mon, 9 Mar 2026 05:46 AM UTC (12 hours ago)
Mon, 9 Mar 2026 01:46 AM EDT |
| Status | Closed |
Out Frankfurt site is upgrading their UPS supply. No downtime is expected Planned start: 05.03.2026 01:00 pm Frankfurt time As part of this activity, an additional UPS module with a capacity of 250 kW will be integrated into the existing UPS system and commissioned. This measure is part of a 500 kVA UPS capacity expansion and aims to increase redundancy and power supply reliability for connected IT loads. The integration will be carried out during normal UPS operation. No generator operation and no bypass switching are required. All activities will be performed and continuously monitored by our Infrastructure team in cooperation with a certified service technician. # | |
Log in to subscribe to changes to this notice.
Set your operation notice contact details for future notifications.